You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Uneven suffering

Reported via desktop in the Slabs - Uneven / Damaged / Cracked category anonymously at 17:38, Tue 25 November 2025

Sent to Northumberland County Council less than a minute later. FixMyStreet ref: 8464581.

The recently re-laid section of the footpath, following the gas works in Haltwhistle, is currently uneven and presents a significant trip hazard. This pathway is heavily used by people of all ages, and with the change in weather conditions it has the potential to become increasingly dangerous. I would be grateful if this area could be inspected and remedial action taken as soon as possible to ensure the safety of all users.

Updates

  • Thank you for your report. We will review this report within 10 working days. If you do have photographs please upload them to the report. This will assist us in our response.

    Posted by Northumberland County Council at 17:38, Tue 25 November 2025

  • Thank you for your report. This has been inspected and the inspector will defect it.

    Posted by Northumberland County Council at 11:41, Fri 5 December 2025

  • Only the original reporter may leave updates. If you made the original report please log in to leave an update.